Existing Conditions Assessment of 3-storey building at TVM

This building was done with local aggregates. Civeng carried out existing condition assessment of the building.

Part of the slab bottom of some floors were detached and fallen down.

corroded steel, area where part of slab fallen off

We removed cores from slab and investigated extent of corrosion.

Core sample being taken
Corrosion of reinforcement indicated on cored samples

We compiled report of our findings, recommendations and submitted to the client.

  • Existing conditions assessment done by: Adnan Ali, Civeng Pvt Ltd
  • Date: 2006